Archive for 6.2.9 Capacity Building, Training and Education

Sub-grant Agreement on Academic Education

Abstract “Personnel Training for Wind Power Technology” is one of the 7 sub-activities of the wind power technology advance. NCEPU has undertaken the academic education task of the wind power technical personnel. A major of “Wind and Power Engineering” has been set up approved by the Ministry of Education, and NCEPU is the first domestic university to set up this undergraduate major.
Author China Renewable Energy Scale-up Programme (CRESP), Update date:22 July 2011
Publisher
Link http://www.cresp.org.cn/english/content.asp?id=1466
Attachment Sorry, no attachments exist.
6 Renewable Energy, 6.2.0 Wind, 6.2.9 Capacity Building, Training and Education

Post Academic Training Program for Northwestern Polytechnical University (NWPU)

Abstract NWPU completed the materials and course construction of the wind power education, built the teaching laboratories for wind power, which makes NWPU with the basic experimental conditions for wind power personnel training; A solid teaching team has been formed; 13 times of wind power design technology trainings and wind power special trainings have been organized and implemented in total, and 6 times of wind power technology symposiums have been held, with more than 400 person-times participation. In the project implementation process, NWPU has established the specialized direction of the wind power technology, set up 4 wind power professional courses for the undergraduates of power and energy major, and has trained nearly 200 undergraduates.
Author China Renewable Energy Scale-up Programme (CRESP), Update date:21 July 2012
Publisher
Link http://www.cresp.org.cn/english/content.asp?id=1467
Attachment Sorry, no attachments exist.
6 Renewable Energy, 6.2.0 Wind, 6.2.9 Capacity Building, Training and Education

Post Academic Training Program (Suzhou Longyuan Bailu Wind Power Vocational Technology Training Center)

Abstract The stage tasks of the project are: 1) carrying out the training courses of key technical staff and the training courses of operation and maintenance personnel of wind power operating companies; 2) completing the publication of wind power training materials, and upgrading and transforming the laboratory equipment and software; 3) preparing the 5-year business development planning, and continuing to carry out the training courses of key technical staff of wind power operating companies.
Author China Renewable Energy Scale-up Programme (CRESP), Update date:20 July 2011
Publisher
Link http://www.cresp.org.cn/english/content.asp?id=1468
Attachment Sorry, no attachments exist.
6 Renewable Energy, 6.2.0 Wind, 6.2.9 Capacity Building, Training and Education

CRESP Wind Turbine Testing Training Materials

Abstract This includes material on: wind energy; test centres and their history; wind turbines in general; acoustic noise measurements; relevant standards; load measurements; type certification process; wind resource measurements; power performance measurements; power quality; test centres; safety and quality.
Author China Renewable Energy Scale-up Programme (CRESP), Update date:30 April 2008
Publisher
Link http://www.cresp.org.cn/english/content.asp?id=838
Attachment Sorry, no attachments exist.
6 Renewable Energy, 6.2.0 Wind, 6.2.9 Capacity Building, Training and Education