Abstract |
he project belongs to the sub-grants projects of wind turbine parts.The project carried out the technology improvement, quality verification and mass production of the 1.5MW wind turbine main shaft bearings, and the development and manufacture of the 3MW wind turbine main shaft bearings. The 3MW project is the implementation emphasis. At the same time, the project needs to complete the testing equipment development of the 1.5MW and 3MW wind turbine main shaft bearings, and complete the 1.5MW wind turbine main shaft bearing testing. |