Preparatory Work for 1 Biomass and 1 Wind Power Development Projects by Jiangsu Guoxin Investment Group Limited

Abstract As one of the ISSF donation projects, the project implementation helps and promotes that the company completed the pre-development work of the two projects: 1) the installation of 47 units of 1.5MW WTGS at Jiangsu Guoxin Dongling Wind Farm, with the total installed capacity of 70,500 KW, which started the construction on September 8,2008, had completed by the end of December 2009, and put into commercial operation in February 2010, with the power generation of about 148.1 million KWh annually. 2) Jiangsu Guoxin Yancheng Biomass Power Plant – Jiangsu Guoxin Yancheng Biomass 30MW Biomass Power Project, the annual consumption of the biomass stalks was over 0.22 million tons, and the annual power generaion is 180 million KWh.