Preparation Work for a 100MW pilot Offshore Windfarm in Fujian

Abstract On the foundation that the CRESP PMO has had the methodology research of Fujian offshore wind power, under the CRESP support, the planning and site selection were carried out in Fujian province, and the preparatory work of the wind tower construction, marine hydrological observation, and pre-feasibility studies, etc. of Fujian offshore wind power project were carried out too. Lots of constraints and key issues faced by the planning and construction of Fujian offshore wind power project was researched typically, the solutions were explored, which explores the experience and provides the references for Fujian offshore wind power industry development.
Author China Renewable Energy Scale-up Programme (CRESP), Update date 1 August 2011
Publisher
Link http://www.cresp.org.cn/english/content.asp?id=1456
Attachment Sorry, no attachments exist.
6.2.0 Wind, 6.2.11 Specific Wind Farms (Onshore and Offshore)