Abstract |
The project uses the agricultural and forestry waste – rice husk as raw materials instead of raw coal, builds 1 set of 20t/h boiler and a back pressure 1.5MW turbine unit, and builds a combined heat and power production line with a chain of boilers, through the, the programmable regulator feeding, oxygen-enriched air ventilation, air and materials cross-control, whirlwind for waste recycling and other technologies. After the completion of the project, the plant construction area is 6,800 square meters, which can form a stable energy-saving capability. |